The applicant must apply to the Los Angeles Department of Building and Safety (LADBS) to initiate the permitting process. The application should include all the necessary details about the construction project, including drawings, site plans, and other supporting documents.
A permit will be issued once the department reviews the application and confirms it meets the requirements.
The type of permit needed depends on the nature of the construction or renovation project. The Los Angeles Municipal Code mandates that any activity involving changes to a property’s structure or appearance must be permitted to ensure safety and compliance. The city also requires separate permits for different aspects of construction.
Below is a detailed look at some of the most common permits:
Building Permit: A building permit is necessary for constructing, remodeling, repairing, demolishing, or moving any building or structure. Each separate building or structure requires its own permit. Even tasks like roofing, replacing doors and windows, repairing chimneys, or installing security bars fall under the building permit category.
Grading Permit: A grading permit is essential for projects that import or export earth materials to or from a construction site. It is also required for any grading work performed in designated “hillside” areas. The grading permit ensures that the land modifications adhere to safety and environmental regulations, reducing the risk of soil erosion and landslides.
Plumbing Permit: A plumbing permit covers various activities, including installing, altering, and repairing plumbing systems. It is also required for changes to rainwater piping, swimming pool piping, subsurface drainage systems, or greywater systems. LADBS may also need a gas piping retest if a system has been out of service for over a year or if a leak is hazardous.
Electrical Permit: An electrical permit is required for any work involving electrical wiring, such as installation, reconstruction, or repair. It is also necessary to add lighting, replace old wiring, or update other electrical systems. An electrical permit helps ensure that all electrical work complies with safety standards and reduces the risk of electrical fires or other hazards.
Mechanical (HVAC) Permit: The installation, alteration, or repair of heating, ventilation, and air conditioning (HVAC) equipment also requires a permit. This applies to new installations and when moving or installing HVAC equipment in relocated buildings.
Sewer Permit: Connecting a property to the sewer system often requires a sewer permit, which can be issued to private individuals or contractors. There are two primary types of sewer connections: Main-Line Connections and Property-Line Connections.
Main Line Connection: When there is no existing house connection sewer extending to the property line, a bonded sewer contractor must extend the sewer line from the property line to the city’s main sewer, subject to a Public Works inspection.
Property Line Connection: This involves connecting or reconnecting to a house connection sewer at the property line and requires a Building and Safety inspection.
In addition to permits, various supporting documents may be necessary to complete the permitting process. These documents provide additional context or detailed information about the project:
1. Plot Plan: A scale drawing that outlines the property’s size, configuration, and manmade features.
2. Parcel Profile Report: This report provides zoning information and any restrictions on the property based on the address or property tax number.
3. Range Files: List any compliance violations or orders within the past 12 months.
4. Geology/Soils Report: These reports are required for grading projects and need approval from the Grading Department.
The Department of Building and Safety issues a Certificate of Occupancy (CofO) after all required inspections are completed and approved. It shows that a building meets the safety standards and building codes for its intended use. Typically, a CofO is issued for new constructions, additions, or changes in occupancy type. It confirms that the structure complies with the necessary building codes for the particular use, such as residential, commercial, or industrial.
Once the final inspection is passed, the Certificate of Occupancy is automatically issued for new construction projects. However, not all construction activities require a C of O. For example, a C of O is generally not issued for projects that don’t involve adding new square footage, such as interior renovations or minor repairs. In cases where older buildings do not have a CofO on file, a particular application process may be needed to obtain one.
It’s important to note that permits for specific types of work, such as electrical, plumbing, and HVAC systems, may only be available for specific years. Records from 1985 to 1990 and 1997 are accessible, while older records might require particular searches or procedures to obtain.
That’s where ATC comes in. A simple property search and pull permits in seconds! You can access all permits and their documents across Los Angeles. Check it out.
Subscribe to our newsletter to receive updates on city planning commissions, cases, and more
Subscribe to our newsletter to receive updates on city planning commissions, cases, and more